June 2015
This is the picture story of the summer's work on our RV-7. Something was done every day, and pictures were taken only to supplement the daily handwritten log. This is not an instruction manual as there were many, many steps in between those illustrated here. As noted in our status report, the RV-7 Quickbuild Wings and Fuselage arrived in Michigan on June 4th. They were delivered to Dalton Airport (3DA) in Flushing, trailered to our shop, and the wings set into cradles with the help of friends from EAA Chapter 77.Into the shop it goes.